Friday, October 18, 2019
Friday, October 18, 2019
Read More5 / 13
MET 101719 RHIT ACADEMIC LOWER
Tribune-Star/Joseph C. Garza
Signed and delivered: The final steel beam for the new academic building on the Rose-Hulman Institute of Technology is lowered onto the main structure during a topping out ceremony on Thursday on the Rose-Hulman campus. The beam was signed by students, faculty and staff and adorned with an evergreen tree to signify the framing was safely completed along with the American flag and Rose-Hulman flag.
- No Comments